Jasa Marga’s scope of business consists of constructing and providing toll road services and it therefore performs the activities as follows:
1. Making investment by constructing new toll roads.
2. Operating and maintaining toll roads.
3. Performing other business to improve the service to toll road users and increase the Company's income, e.g. rest areas, advertisement, fiber optic network, etc.
4. Developing other business related to toll road industry.
Based on the toll road concessions granted directly from the Government, Jasa Marga currently manages and operates 13 toll road concessions through its nine branch offices and one subsidiary, as follows :
- Jagorawi Toll Road
- Jakarta-Tangerang Toll Road
- Jakarta- Cikampek Toll Road
- Dalam Kota Jakarta Toll Road
- Prof. Dr.Ir. Sedyatmo Toll Road
- Serpong-Pondok Aren Toll Road (operated by JLJ)
- Cikampek -Purwakarta-Cileunyi Toll Road
- Padalarang –Cileunyi Toll Road
- Palimanan-Kanci Toll Road
- Semarang Toll Road
- Surabaya Gempol Toll Road
- Belawan-Medan-Tanjung Morawa Toll Road
- Jakarta Outer Ring Road (operated by JLJ )
Toll Roads are developed by Jasa Marga Subsidiaries, as follows :
- Jakarta Outer Ring Road, by PT Jalan Tol Lingkar Luar Jakarta (JLJ), with share ownership 99%

- Bogor Ring Road, by PT Marga Sarana Jabar (MSJ) with share ownership 55%

- Semarang-Solo Toll Road, by PT Trans Marga Jateng (TMJ) with share ownership 60%

- Serpong-Kunciran Toll Road, by PT Marga Trans Nusantara (MTN) with share ownership 60%

- Surabaya-Mojokerto Toll Road, by PT Marga Nujyasumo Agung (MNA) with share ownership 55%

- JORR W2 North Toll Road, by PT Marga Lingkar Jakarta (MLJ) with share ownership 65%

- Gempol-Pasuruan Toll Road, by PT Trans Marga Jatim Pasuruan (TMJP) with share ownership 80%

- Kunciran-Cengkareng Toll Road, by PT Marga Kunciran Cengkareng (MKC) with share ownership 75%

- Gempol-Pandaan Toll Road PT Margabumi Adhikara (MBAR) with share ownership 52%

PT Jalantol Lingkar Jakarta (JLJ)
Section Managed
Jakarta Outer Ring Road Toll Road
Length of Toll Road
42 km
Shareholders Composition
PT Jasa Marga (Persero) Tbk. 99%
PT Induk Koperasi Karyawan Jasa Marga 1 %
Company Overview
PT JLJ is the company that carries out the operation along with assets security and maintenance of Jakarta Outer Ring Road Toll Road from Cilincing to Ulujami. Jakarta Outer Ring Road is integrated with Jagorawi, Jakarta-Cikampek and Ulujami-Serpong Toll Roads.
Bogor Ring Road (PT Marga Sarana Jabar)
Bogor
Section Managed
Bogor Outer Ring Road Toll Road
Length of Toll Road
11 km
Concession Period
45 years
Shareholders Composition
- PT Jasa Marga (Persero) Tbk. 55%
- PT Jasa Sarana Jabar 45 %
Company Overview
Bogor Outer Ring Road Toll Road is connected to Jagorawi Toll Road at Sentul Selatan to Dramaga (the campus of IPB). The toll road is developed in stages as follows:
- Phase I Sentul Selatan-Kedung Halang (3.8 Km) operated since November 2009
- Phase II Kedung Halang-Semplak (4 km) currently in the process of land acquisition
- Phase III Semplak-Darmaga (3.2 km)
Semarang-Solo (PT Trans Marga Jateng)
Section Managed
Semarang-Solo Toll Road
Length of Toll Road
72.88 Km
Concession Period
45 years
Shareholders Composition
- PT Jasa Marga (Persero) Tbk. 60%
- PT Sarana Pembangunan Jawa Tengah 40 %
Company Overview
Semarang-Solo Toll Road is connected to Semarang Toll Road at Tembalang. The toll road is developed in stages as follows:
- Stage I Semarang-Bawen (23.1 Km). Semarang-Ungaran (11. 3 km), which is Section 1 of Stage I is fully constructed and is in trial operation since 20 August 2011, whereas Ungaran-Bawen (11.8 km), which is Section 2 of Stage I in under construction.
- Stage II Bawen-Solo (49.78 km)
PT Marga Trans Nusantara (MTN)
mso-bidi-theme-font:minor-bidi;} --> Section Managed
Kunciran-Serpong Toll Road
Length of Toll Road
11.2 km
Concession Period
35 years
Shareholders Composition
- PT Jasa Marga (Persero) Tbk. 60%
- Astratel 30 %
- PT Trans Utama Sejahtera 10%
Company Overview
PT Marga Trans Nusantara holds the concession of Kunciran-Serpong Toll Road, which is part of Jakarta Outer Ring Road (JORR) II Toll Road and is connected to Jakarta-Tangerang and Kunciran-Cengkareng Toll Roads.
PT Marga Nujyasumo Agung (MNA)
Section Managed
Surabaya-Mojokerto Toll Road
Length of Toll Road
36.3 km
Concession Period
2007 – 2049
Shareholders Composition
- PT Jasa Marga (Persero) Tbk. 55%
- Moeladi Group 25 %
- PT Wijaya Karya 20 %
Company Overview
Surabaya-Mojokerto Toll Road is developed in stages as follows:
- Section 1A: Waru-Sepanjang (2.3 km), operated since 5 September 2011
- Section 1B: Sepanjang-WRR (4.3 km)
- Section 2: WRR-Driyorejo (4.3 km)
- Section 3: Driyorejo-Kriyan (4.3 km)
- Section 4: Krian-Mojokerto (4.3 km)
JORR W2 Utara
Section Managed
JORR W2 North Toll Road
Length of Toll Road
7.67 km
Concession Period
2005 – 2044
Shareholders Composition
PT Jasa Marga (Persero) Tbk. 65%
PT Jakarta Marga Jaya 35 %
Company Overview
JORR W2 North Toll Road is part of Jakarta Outer Ring Road Toll Road. When operated, the said section will complete the already operated JORR Toll Road. With the entire sections of JORR Toll Road fully operated, it will ease the flow of traffic distribution from the southern and eastern part of Jakarta to the western part or Tangerang, and vice versa.
Gempol - Pasuruan( PT Trans Marga Jatim )
Section Managed
Gempol-Pasuruan Toll Road
Length of Toll Road
34.2 km
Concession Period
45 years
Shareholders Composition
- PT Jasa Marga (Persero) Tbk. 80%
- PT Jatim Marga Utama 20 %
Company Overview
Gempol-Pasuruan Toll Road will be connected to Surabaya-Gempol and Gempol-Pandaan Toll Roads. The toll road is developed in stages as follows:
- Phase I Gempol-Rembang (13.9 Km)
- Phase II Rembang-Pasuruan (8.1)
- Phase III Pasuruan-Grati (12.2 km)
PT Marga Kunciran Cengkareng (MKC)
Section Managed
Cengkareng-Kunciran Toll Road
Length of Toll Road
15 km
Concession Period
35 years
Shareholders Composition
- PT Jasa Marga (Persero) Tbk. 75%
- PT CMS Work International Ltd 21 %
- PT Istaka Karya, 1
- PT Nindya Karya, 1%
- PT Wijaya Karya 2%
PT Marga Kunciran Cengkareng holds the concession of Cengkareng-Kunciran Toll Road, which is part of Jakarta Outer Ring Road (JORR) II Toll Road and is connected to Prof. Dr. Sedyatmo (Airport), Jakarta-Tangerang and Serpong-Kunciran Toll Roads
PT Margabumi Adhikaraya (MBAR)
Section Managed
Gempol-Pandaan Toll Road
Length of Toll Road
13.6 km
Concession Period
35 years
Shareholders Composition
- PT Jasa Marga 52.05%
- Perusda Pasuruan 25.42%
- PT Margabumi Matraraya 20.57%
- Entrada Utama 1.96%
Company Overview
Gempol-Pandaan Toll Road is developed in stages as follows:
- Section 1 Gempol-Beji (3 km)
- Section 2 Beji-Pandaan (10.6 km)
Jasa Marga main business is toll road, with activities as follows:
1. Investing new toll road
2. Toll road operating and maintenance
3. Business Diversification in Line with Core Business : Rest Area Development, Outdoor Advertising, Fiber optic network, etc
4. Developing other business around Toll Road corridor
To date Jasa Marga has manages and operates 13 toll road through nine branches and one subsidiary namely :
